Procurement scenario
Industrial Piping
On an installed line, the space around the fitting is often the real constraint. Supports, adjacent insulation and access platforms decide whether a removable structure can be taken off and refitted at all.
Typical procurement problems
What to check on site
- No recorded clearance to supports, walls or neighbouring lines
- Different insulation thicknesses already present on adjacent pipework
- Removal direction not considered in the layout
- Existing nameplates or test points that must stay visible
Information to prepare
What to send with your inquiry
- Plan and elevation sketches or photographs showing clearances
- Existing insulation details where relevant
- Required removal direction and available working space
- List of points that must remain accessible
From the FAQ
Start with your equipment list
We will record the open questions in writing. Detailed drawings and dimensions can follow.